2023, Supply of Segment Molds for Connecting Tunnels of Cross Island Line – Punggol Extension, Singapore
2023, Supply of Segment Molds for Connecting Tunnels of Cross Island Line – Punggol Extension, Singapore
2023-11-05 08:50:00
The Cross Island Line (CRL) Punggol Extension in Singapore is a critical part of the country's long-term plan to expand its public transportation network. The extension is aimed at improving connectivity between key districts and facilitating the efficient movement of people across Singapore, with a special focus on the eastern and northern regions. This line will reduce travel times, support Singapore's sustainable urban mobility goals, and ease congestion in densely populated areas.For this project, Unicrane has supplied 2 sets of left taper ring molds and 2 sets of right taper ring molds with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R). These molds will be used in the construction of essential connecting tunnels, reinforcing our commitment to supporting Singapore's ongoing metro expansion and sustainable transport infrastructure development.
 2023, Supply of Rectangular Precast Segment Mold for N109A Project, Singapore
2023, Supply of Rectangular Precast Segment Mold for N109A Project, Singapore
2023-10-25 08:50:00
The Singapore N109A Project is a crucial part of the North-South Corridor (NSC) and the development of Teck Ghee Station for the future Cross Island Line (CRL). This project aims to improve connectivity between northern towns and the city center by intergrating road and rail infrastructure, enhancing the overall transportation efficiency in Singapore's heartlands.Key components of the N109A Project include the construction of an 800m road tunnel, an underground MRT station box for Teck Ghee Station, and commuter facilities such as pedestrian bridges, bus stops, sheltered walkways, and cycling paths. This intergration of various transportation modes aims to streamline urban mobility, reduce congestion, and improve commuter convenience.For this project, Unicrane has supplied 1 set of rectangular precast segment molds with the specification W7.6m × H6.4m × L1.5m × T0.5m (4P/R), contributing to the construction of essential tunnel and station components.
 2023, Supply of Segment Molds for CP103 Project, Metro Manila Subway, Philippines
2023, Supply of Segment Molds for CP103 Project, Metro Manila Subway, Philippines
2023-10-15 09:40:00
The CP103 Project is part of the Metro Manila Subway Project (MMSP), the Philippines' first-ever subway system, designed to enhance urban mobility and reduce congestion in Metro Manila. This contract covers a critical 6.5-kilometer section of the subway, including Anonas and Camp Aguinaldo Stations, as well as three interstation tunnels connecting to East Avenue and Ortigas Avenue Stations. The project is part of the government's strategy to modernize transportation infrastructure, alleviate traffic congestion, and provide an efficient and sustainable transport network for millions of commuters.For this project, Unicrane has supplied 3 sets of left taper ring molds, 2 sets of right taper ring molds, 11 sets of universal ring molds, and 2 sets of convertible taper molds, with the specification OD 6.7m × 1.5m × 0.3m (5+1P/R). These molds will be used in the construction essential tunnel sections, supporting the implementation of one of the Philippines' most ambitious infrastructure projects.
 2023, Supply of Segment Molds for CR111 Project, Singapore
2023, Supply of Segment Molds for CR111 Project, Singapore
2023-08-28 10:10:00
The CR111 Project involves the Design and Construction of Defu Station and Tunnels as part of the first phase of the Singapore Cross Island Line (CRL1). The project includes the construction of Defu Station and associated tunnels, with twin tunnels of approximately 1.4km each. This project is a key component of the Singapore MRT system and will significantly improve connectivity across the island.The project also features the use of autonomous tunnel boring machines (TBMs), specifically the first autonomous TBM in Singapore, named "Daphne", which will enhance tunneling precision, real-time monitoring, and predictive analysis.For this project, Unicrane has supplied 2 sets of left taper ring molds and 2 sets of right taper ring molds, with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R). These molds play a crucial role in the construction of tunnel sections and demonstrate Unicrane's contribution to supporting cutting-edge tunnel technology and urban infrastructure development in Singapore.
 2023, Supply of Segment Molds for Jakarta CP202 Project, Indonesia
2023, Supply of Segment Molds for Jakarta CP202 Project, Indonesia
2023-07-28 13:20:00
The Jakarta CP202 Project is part of the MRT North-South Line Phase 2, focusing on the construction of a 1.84 km underground route and three stations (Harmoni, Sawah Besar, Mangga Besar) in Central Jakarta, a densely populated and highly congested urban area. This critical phase of the Jakarta MRT system aims to improve public transportation and ease traffic congestion by connecting key urban areas with the rest of the network. The construction is challenging due to the high density of surrounding infrastructure and the need for constant traffic management.For this project, Unicrane has supplied 1 set of standard ring molds and 2 sets of convertible taper ring molds with the specification OD 6.65m × 1.5m × 0.3m (5+1P/R). These molds will support the construction of essential tunnel sections, playing a key role in ensuring the project’s success and helping to advance Jakarta’s transport infrastructure.
« 1 2 3 4 (5) 6 7 8 ... 49 »