Metro of  Changzhou
Metro of Changzhou
2017-08-14 10:30:00
Client: CHANGZHOU CRCC-CZUC ARTIFACTS Co., LTD
Project:Metro of  ChangZhou
Date:2015/07Φ6.2×0.35T×1.2L(6P/R)-double tappered  ring- 2 set
 Metro of Wǔhàn
Metro of Wǔhàn
2017-08-14 10:30:00
Client: China Railway Construction Corporation (CRCC)
Project:Metro of Wǔhàn
Date:2015/07Φ6.2×0.35T×1.5L(6P/R)-double tappered  ring- 4 set
 Mochizukisamu River Japan
Mochizukisamu River Japan
2017-08-14 10:20:00
Client: Nippon Hume IntetnationalNippon Hume IntetnationalProject: River improvement-riparian works of Mochizukisamu RiverDate:2015/06Φ5.25×0.225T×1.2L(6P/R )-straight ring- 1 set
 Award of Hong Kong MTRC 1128 from Dragages & Bouygues JV
Award of Hong Kong MTRC 1128 from Dragages & Bouygues JV
2015-06-02 00:08:31
Client:Dragages & Bouygues JVProject:Hong Kong MTRC 1128φ7100×1500 x 300(7P/R)double tappered ring- 3 setVibration method: Pnuematic vibrator attached underneath the mould.* Anchor Gasket desgin mould, First time in Hong Kong.
 Award for Indonesia Jakarta Metro Proejct package CP106
Award for Indonesia Jakarta Metro Proejct package CP106
2015-04-29 15:46:34
Client:Mitsui-SumitomoProject:Indonesia Jakarta Metro CP106φ6650××300×1500(6P/R)Straight ring- 5 setchangable single tapper mould to left & right - 1 setVibration method: Electrical vibrator attached underneath the mould. After the completion of design and supply of segmet mould for Jakarta MRT CP104~105 (Shimizu & Obayashi Wika Jaya Konstruksi JV), Unicrane has further awarded the project for CP106 (Mitsui-Sumitomo). Both underground packages in Jakarta Indonesia are awarded by Unicrane. A changeable tapper mould for straight, ring and left is not any standard mould and commond to see, Unicrane is able to design and fabricated with same high tolerance requirement as standard type. 
« 1 ... 44 45 46 (47) 48 49 50 ... 52 »