Client: SEN YEH CONSTRUCTION CO., Ltd.

  • 设备
  • 订制
Equipment: Gantry Iron
更新日期:2025-05-21 14:26:07

Installation Location: Taipei MRT Tucheng Line
Specifications/Usage: Electric Multiple Unit (EMU) Track Equipment

請填寫以下資料

2 + 8 = ?  
Input the result from the expression
Maximum attempts you can try: 10
 
* = Required