The CR202 Project is part of the Cross Island Line (CRL) Phase 2, a significant infrastructure initiative by Singapore's Land Transport Authority (LTA). The project involves the design and construction of a 5km tunnel with a 12m diameter, connecting the future Turf City station to Bright Hill station via a single large-diameter tunnel.
For this project, Unicrane has supplied 2 sets and 6 pieces of combined molds with the specification OD 12.2m × 2.0m × 0.45m (9+1P/R). These molds are crucial for producing high-quality tunnel segments that will support the tunnel's construction while adhering to the stringent safety and environmental standards required for the project.