The CR112 Project is part of the Cross Island Line (CRL) in Singapore, focusing on constructing a 1.79km tunnel and the Hougang interchange station to connect with the exisiting North East Line (NEL). The project is notable for its location in a densely populated residential area, requiring high-precision Tunnel Boring Machine (TBM) tunneling and careful project management to minimize community impact while ensuring safety.
For this project, Unicrane has supplied 2 sets of left taper ring molds and 1 set of right taper ring molds with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R). These molds are crucial for the production of high quality tunnel segments, contributing to the overall success of the project.