2022, Supply of Segment Molds for CR112 Project, Singapore
2022, Supply of Segment Molds for CR112 Project, Singapore
2022-12-20 09:10:00
The CR112 Project is part of the Cross Island Line (CRL) in Singapore, focusing on constructing a 1.79km tunnel and the Hougang interchange station to connect with the exisiting North East Line (NEL). The project is notable for its location in a densely populated residential area, requiring high-precision Tunnel Boring Machine (TBM) tunneling and careful project management to minimize community impact while ensuring safety.For this project, Unicrane has supplied 2 sets of left taper ring molds and 1 set of right taper ring molds with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R). These molds are crucial for the production of high quality tunnel segments, contributing to the overall success of the project.
 2022, Supply of Segment Molds for Mumbai Sewage Disposal Project (MSDP) Stage II, PST-1, India
2022, Supply of Segment Molds for Mumbai Sewage Disposal Project (MSDP) Stage II, PST-1, India
2022-11-15 09:40:00
The Mumbai Sewage Disposal Project (MSDP) Stage II, PST-1 is a key component of a larger initiative aimed at improving the sewage collection collection, treatment, and disposal systems in Mumbai to reduce environmental pollution and enhance urban infrastructure. This phase involves the construction of underground sewage tunnels to upgrade wastewater management infrastructure in critical areas, such as Malad, with the use of a TBM provided by Terratec.For this project, Unicrane has supplied 6 sets of universal ring molds with the specification OD 3.6m × 1.2m × 0.2m (5+1P/R) for this project. These molds are essential for the construction of tunnel segments that will form part of the sewage disposal system, ensuring that the infrastructure meets high safety and durability standards.
 2022, Supply of Segment Molds for CR102 Project, Singapore
2022, Supply of Segment Molds for CR102 Project, Singapore
2022-10-20 13:10:00
The CR102 Project is part of Singapore's Cross Island Line (CRL), connecting the Aviation Park Station to the Changi East Depot. This project will improve connectivity to key areas, reduce commute times, and enhance access to Singapore's aviation hub. It involves constructing tunnels using advanced Earth Pressure Balance (EPB) shield machines, navigating difficult ground conditions near Changi Airport.For this project, Unicrane has supplied 2 sets of left taper ring molds and 2 sets of right taper ring molds with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R), essential for producing the tunnel segments required for this critical infrastructure project.
 2022, Supply of Segment Molds for CR109 Project, Singapore
2022, Supply of Segment Molds for CR109 Project, Singapore
2022-08-13 14:00:00
The CR109 Project is a section of the Cross Island Line (CRL) Phase 3, Singapore's eighth Mass Rapid Transit (MRT) line. The CRL is set to become the backbone of Singapore's public transport network, enhancing connectivity by linking major residential, business, and recreational hubs across the island. This project is the key component of Singapore's effort to provide more efficient travel options, reduce congetsion, and support sustainable urban development.For this project, Unicrane has supplied 2 sets of left taper ring molds and 2 sets of right taper ring mods with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R), essenical for producing high quality tunnel segments for this project.
 2022, Supply of Segment Molds for CR115 Project, Singapore
2022, Supply of Segment Molds for CR115 Project, Singapore
2022-07-27 14:20:00
The CR115 Project is part of Singapore's Cross Island Line (CRL), which aims to enhance connectivity and provide a comprehensive underground transport network across the island. The project involves the design and construction of Tavistock Station, an underground Civil Defence Station, as well as the associated tunnels. This key section of CRL Phase I is focused on connecting residential and industrial areas in the eastern and north-eastern corridors, improving access to vital hubs like the Punggol Digital District and serving over 100,000 households.For this project, Unicrane has supplied 2 sets of left taper ring molds and 2 sets of right taper ring molds with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R), crucial for producing high-quality tunnel segments for this major infrastructure project.
« 1 ... 4 5 6 (7) 8 9 10 ... 49 »