2023, Supply of Segment Molds for P103 Project, Singapore
2023-05-28 15:40:00
The P103 Project is a critical part of Singapore's ongoing metro expansion aimed at enhancing urban mobility and improving the efficiency of its MRT system. The project involves constructing tunnel segments for new MRT lines that will connect key parts of the city, reducing congestion and enhancing accessibility for commuters.For this project, Unicrane has supplied 2 sets of left taper ring moulds, 2 sets of right taper ring moulds, and 1 set of convertible taper moulds with the specification OD 12.2m × 2m × 0.45m (9+1P/R) and OD 12.2m × 1.5m × 0.45m (9+1P/R). These molds are designed to produce high-quality, precision-engineered tunnel segments essential for the safe and efficient construction of the MRT tunnels.
2023, Supply of Segment Molds for CR202 Project, Singapore
2023-04-25 09:00:00
The CR202 Project is part of the Cross Island Line (CRL) Phase 2, a significant infrastructure initiative by Singapore's Land Transport Authority (LTA). The project involves the design and construction of a 5km tunnel with a 12m diameter, connecting the future Turf City station to Bright Hill station via a single large-diameter tunnel.For this project, Unicrane has supplied 2 sets and 6 pieces of combined molds with the specification OD 12.2m × 2.0m × 0.45m (9+1P/R). These molds are crucial for producing high-quality tunnel segments that will support the tunnel's construction while adhering to the stringent safety and environmental standards required for the project.
2023, Supply of Segment Molds for CR110 Project, Singapore
2023-01-12 11:30:00
The CR110 Project is part of Singapore's Cross Island Line (CRL) Phase 1, focusing on the design and construction of a bored tunnel between Tampines North Station and Defu Station. The project is a key part of Singapore’s expanding MRT network, which will provide enhanced connectivity across the island.For this project, Unicrane has supplied 1 set of left taper ring moulds, 1 set of right taper ring moulds, and 1 set of straight ring moulds with the specification OD 12.2m × 2.0m × 0.45m (9+1P/R). These moulds are integral to the production of tunnel segments, helping to ensure the precision and durability required for such a large-scale infrastructure project.
2022, Supply of Segment Molds for CR112 Project, Singapore
2022-12-20 09:10:00
The CR112 Project is part of the Cross Island Line (CRL) in Singapore, focusing on constructing a 1.79km tunnel and the Hougang interchange station to connect with the exisiting North East Line (NEL). The project is notable for its location in a densely populated residential area, requiring high-precision Tunnel Boring Machine (TBM) tunneling and careful project management to minimize community impact while ensuring safety.For this project, Unicrane has supplied 2 sets of left taper ring molds and 1 set of right taper ring molds with the specification OD 6.9m × 1.4m × 0.3m (7+1P/R). These molds are crucial for the production of high quality tunnel segments, contributing to the overall success of the project.
2022, Supply of Segment Molds for Mumbai Sewage Disposal Project (MSDP) Stage II, PST-1, India
2022-11-15 09:40:00
The Mumbai Sewage Disposal Project (MSDP) Stage II, PST-1 is a key component of a larger initiative aimed at improving the sewage collection collection, treatment, and disposal systems in Mumbai to reduce environmental pollution and enhance urban infrastructure. This phase involves the construction of underground sewage tunnels to upgrade wastewater management infrastructure in critical areas, such as Malad, with the use of a TBM provided by Terratec.For this project, Unicrane has supplied 6 sets of universal ring molds with the specification OD 3.6m × 1.2m × 0.2m (5+1P/R) for this project. These molds are essential for the construction of tunnel segments that will form part of the sewage disposal system, ensuring that the infrastructure meets high safety and durability standards.